Renovation Funding in Dortmund 2026: Loans, Grants and Tax Relief

Modernisation funding in Dortmund 2026: NRW.BANK loans up to €220,000 with a repayment waiver, BEG grants, KfW and tax relief – apply before you sign.

By Kuczak editorial team·

Apartment building with scaffolding and Kuczak site signs on the façade📍 Dortmund
Façade with scaffolding during the works · Kuczak
Interest in years 1–5
0.0%
NRW.BANK modernisation, City of Dortmund
Repayment waiver
15–55%
Rented flats, depending on the measure
BEG building envelope
15% + 5%
Basic funding + iSFP bonus
Tax relief § 35c
€40,000
Max. per property, energy efficiency

Key points in brief

  • The City of Dortmund and NRW.BANK grant modernisation loans of up to €220,000 per flat: 0.0% interest for the first 5 years, 0.5% thereafter, plus a repayment waiver of 15 to 55%.
  • For rented flats this comes with rent and occupancy restrictions (approved rent currently €7.25 or €8.40/m²); for owner-occupiers, income limits apply.
  • Nationwide in 2026, there is a 15% BEG grant for the building envelope, and 5% more with a renovation roadmap (iSFP) under new rules.
  • KfW 159 (age-appropriate conversion, up to €50,000 per flat) is still available; the 455-B grant has been exhausted for 2026.
  • Golden rule: apply for funding or clarify the conditions first, then place the order – otherwise the funding is often lost.

If you are renovating in Dortmund in 2026, you can draw on several funding pots: the City of Dortmund, together with NRW.BANK (the state development bank of North Rhine-Westphalia), grants modernisation loans of up to €220,000 per flat at 0.0% interest for the first five years and with a repayment waiver that writes off part of the loan. On top of that there are federal grants (BEG), loans from KfW (Germany’s state-owned development bank) and tax reductions. The order of events is crucial: almost always, it is apply first, then commission the work. This guide shows which programme suits which project.

Overview: which funding suits your project?

Programme Who it is for Type Key data 2026
Modernisation of rented flats (City of Dortmund / NRW.BANK) Landlords in Dortmund Loan + repayment waiver Up to €220,000 per flat, 15–55% waiver
Modernisation of owner-occupied homes (City of Dortmund / NRW.BANK) Owner-occupiers within the income limit Loan + repayment waiver €5,000–220,000, at least 25% waiver (group A)
BEG individual measures (BAFA) Owners nationwide Grant 15% building envelope, + 5% with iSFP
KfW 159 age-appropriate conversion Owners and tenants Loan Up to €50,000 per flat
KfW 261 residential buildings Renovation to Efficiency House standard Loan + repayment grant Up to €150,000 per flat, up to 40% grant
§ 35a / § 35c EStG Owner-occupiers Tax reduction 20% of labour costs up to €1,200/year or up to €40,000 per property

Important: Funding conditions change frequently. All information reflects the position as of 21 November 2026 and the linked sources. Before applying, check the current version with the funding body.

Block of flats with scaffolding during renovation work on the façade
Modernising a block of flats: for rented flats in Dortmund, funding loans of up to €220,000 per flat are available.

City of Dortmund modernisation funding for rented flats

The state of NRW funds the modernisation of rented flats via NRW.BANK; in Dortmund, approval is granted by the Housing Office (Amt für Wohnen), Housing Support team (Team Wohnraumförderung). The basis is the state’s 2026 public housing funding guideline (Förderrichtlinie Öffentliches Wohnen im Land NRW 2026).

What is funded

  • energy-efficiency modernisation
  • removing barriers and alterations for severe disability or care needs
  • protection against extreme weather
  • extensions, conversions and adding storeys
  • burglary protection and smart home technology
Older bathroom with a corner bath and light tiles before modernisation
Removing barriers – in the bathroom, for example – is among the eligible measures under Dortmund’s modernisation funding.

Pure repairs are only funded together with a modernisation and must not account for the majority of the costs.

Terms

  • Loan: 100% of the eligible construction and ancillary construction costs, up to €220,000 per residential unit
  • Interest: 0.0% for the first five years, 0.5% thereafter; fixed-interest period of 25 or 30 years, 2% repayment
  • Repayment waiver: 25% (income group A) or 15% (group B), each plus 5 percentage points for certain efficiency standards or a 30-year restriction period; 50% for individual measures relating to severe disability or a care level – 15 to 55% in total
  • Costs: 1% processing fee (min. €230), plus a 0.5% administration charge from the third year

The trade-off: rent and occupancy restrictions

Restrictions apply for the duration of the fixed-interest period. The approved rent is currently €7.25/m² (group A) or €8.40/m² (group B); new tenants need a housing entitlement certificate (Wohnberechtigungsschein), and the Housing Office has the right to nominate tenants. For comparison: according to the 2024 housing market report, the average asking rent for existing flats in Dortmund was €8.97/m². Whether the funding pays off therefore depends heavily on your rent and the repayment waiver. Owners with several flats and property management companies can find out how we work under Renovation for property management companies.

Requirements: the flat is in Dortmund, has been ready for occupancy for at least five years, and work has not yet started.

Modernisation funding for owner-occupied homes

Owners who live in their own flat or house in Dortmund can also obtain an NRW.BANK loan:

  • Amount: €5,000 to €220,000, up to 100% of the costs, no equity required
  • Interest and repayment: as for rented flats
  • Repayment waiver: at least 25% (group A), plus 5 percentage points for each energy or ecological criterion met, 50% for measures relating to disability or care needs
  • Income: Households up to the income limit and up to 40% above it are eligible – above the limit without a repayment waiver. In urban regeneration areas (Stadterneuerungsgebiete) there is no income limit.

Tip: With funding for owner-occupied homes, you may sign supply and service contracts before approval – you just must not start the work itself. That makes planning with your contractor easier.

Newly installed water pipes and plumbing connections before interior finishing
New pipes are often part of a modernisation; under the rental housing funding, pure repairs only count together with a modernisation.

Federal funding: BEG individual measures 2026

Since the BEG reform of 21 July 2026, the following applies to individual measures on residential buildings:

  • 15% basic funding for work on the building envelope (e.g. insulation, windows), building services other than heating, and heating optimisation to improve efficiency
  • + 5% iSFP bonus if a funded individual renovation roadmap is in place – new: only from a minimum eligible volume of €30,000 (single-family house; higher for blocks of flats) and only for the amount above this threshold
  • Maximum amounts per calendar year tiered by residential units: without iSFP, €30,000 for the first unit, €15,000 each for the 2nd to 6th, and €8,000 from the 7th unit onwards; twice as much with iSFP
  • For the building envelope, an energy efficiency expert is required

Heating funding is handled separately by KfW (programme 458, 30 to 80%).

Before: Two-storey residential building with scaffolding and Kuczak site signs before the façade renovation
Before
After: The same residential building after the façade renovation, with a light façade and a dark plinth
After
Building envelope: façade before and after the work. In 2026 the BEG funds work on the building envelope at 15%, with the iSFP bonus 5% more under certain conditions.

KfW programmes: what is still available in 2026

  • KfW 159 – age-appropriate conversion (loan): up to €50,000 per flat for reducing barriers and burglary protection; still available.
  • KfW 455-B – grant for reducing barriers: applications suspended since 31 July 2026, funds for 2026 exhausted. The scheme may reopen in 2027.
  • KfW 261 – residential buildings loan: up to €150,000 per flat and up to a 40% repayment grant for renovation to Efficiency House (Effizienzhaus) standard.
  • KfW 308 – Jung kauft Alt (“Young buys old”): for families buying a house in need of renovation; since 3 August 2026, €140,000 (one child) up to €180,000 (three or more children), energy-efficiency renovation within 54 months – now also possible with individual measures.
Finished bathroom with bath, washbasin and heated towel rail after modernisation
Bathroom after a modernisation – a Kuczak project example.

Tax relief instead of funding: § 35a and § 35c EStG

If you live in the property yourself and do not use funding for the same measure, you can save tax:

Rule What applies Maximum
§ 35a EStG tradespeople’s services 20% of labour costs (not materials); invoice and bank transfer required €1,200 per year
§ 35c EStG energy-efficiency renovation 7% in the year of completion and the following year, 6% in the third year; building older than 10 years; certificate from the specialist contractor €40,000 per property

Outlook: The government draft of the Income Tax Reform Act 2027 (Einkommensteuerreformgesetz 2027) proposes cutting the § 35a relief to 15% and a maximum of €900. This is not yet law – if you pay for tradespeople’s services in 2026, you still benefit from 20% on the current basis.

If you are a landlord modernising a flat between two tenancies, you will find the process and legal framework in our guide Renovation between tenancies in Dortmund. For more on renovation costs, read our guide Flat refurbishment in Dortmund: costs per m² and process.

The most important rule: apply before you commission

The most common reason funding is lost is a contract signed too early.

  • Dortmund modernisation funding: do not start before approval. Signing contracts beforehand is permitted under the funding for owner-occupied homes.
  • BEG individual measures: supply and service contracts must contain a condition precedent or condition subsequent linked to the funding approval. A simple right of withdrawal is not enough. Planning and advisory services may be commissioned beforehand. Once you have applied, you may start at your own risk.
  • KfW 159: a contract with a condition precedent, or a documented advice meeting before the contract is signed.
Flat stripped to the bare shell with exposed pipes and a passage between rooms before interior finishing
Application or approval first, then start work – otherwise you may lose the funding.

Funding in Dortmund in 6 steps

  1. Describe your project: What needs doing – energy efficiency, accessibility, extension, bathroom, pipes and wiring?
  2. Choose the programme: Rented flat or owner-occupied? Grant, loan or tax relief?
  3. Get advice: For Dortmund’s funding, the Housing Office recommends an advice meeting; for the BEG you need an energy efficiency expert.
  4. Obtain quotes: with a clear specification of works, so the eligible costs are transparent – for example for a flat refurbishment in Dortmund.
  5. Apply and draft the contract correctly: observe the conditions of the relevant funding.
  6. Carry out, document, settle: file invoices, photos and supporting documents carefully.
The same hallway in three stages: original condition, during refurbishment and after the work
Photos of each stage help with handover, supporting documents and final accounts.

Contact: Dortmund Housing Office

Stadt Dortmund, Amt für Wohnen, Team Wohnraumförderung, Südwall 2-4, 44122 Dortmund, telephone 0231 50-23958, wohnraumfoerderung@stadtdo.de.

For your building project itself, you can reach Kuczak via the Contact page – our base and service area are in Dortmund.

For projects involving several trades – such as bathroom, pipes and floors – a general contractor for renovation who brings the quote and process together is worthwhile. Our projects show examples from practice.

Planning a modernisation in Dortmund and want to sort out the scope for your quote and funding application? Start the Projekt-Check – you will see your overview before you enter any contact details.

Terms briefly explained

Repayment waiver (Tilgungsnachlass)
The part of a funding loan that does not have to be repaid – 15 to 55% under Dortmund’s modernisation funding, depending on the case.
Approved rent (Bewilligungsmiete)
The maximum rent that may be charged after a funded modernisation for the duration of the restriction period (currently €7.25 or €8.40/m²).
iSFP (individual renovation roadmap)
Individueller Sanierungsfahrplan: a step-by-step plan for a building drawn up by energy advisers; under certain conditions it brings a 5% bonus under the BEG.
BEG EM
Bundesförderung für effiziente Gebäude – Einzelmaßnahmen (federal funding for efficient buildings – individual measures): grants via BAFA, e.g. for the building envelope.
Condition precedent (aufschiebende Bedingung)
A contract clause under which an order only takes effect once funding has been approved – a requirement under the BEG if the order is placed before approval.

Related services in Dortmund

Sources & further information

  1. Stadt Dortmund: Modernisierungsförderung für Mietwohnungen (DE)
  2. Stadt Dortmund: Modernisierungsförderung für Wohneigentum (DE)
  3. NRW.BANK: Mietwohnraumförderung – Modernisierung (DE)
  4. NRW.BANK: Eigentumsförderung – Modernisierung (DE)
  5. BAFA: BEG Einzelmaßnahmen – Gebäudehülle (DE)
  6. BMWE: BEG-FAQ (Fassung 21.08.2026) (DE)
  7. KfW: Förderprodukte für Bestandsimmobilien (DE)
  8. KfW: Altersgerecht Umbauen – Kredit 159 (DE)
  9. KfW: Antragsstopp Zuschuss 455-B (31.07.2026) (DE)
  10. KfW: Jung kauft Alt (308) – Änderungen ab 03.08.2026 (DE)
  11. § 35a EStG – Handwerkerleistungen (DE)
  12. § 35c EStG – energetische Maßnahmen (DE)
  13. Bundesrat: Regierungsentwurf Einkommensteuerreformgesetz 2027 (Drs. 507/26) (DE)

Kuczak editorial team

Kuczak UG (haftungsbeschränkt), Am Grenzgraben 20, 44319 Dortmund. Renovation, refurbishment and modernisation in Dortmund and NRW since 2023. Responsible chamber: Chamber of Crafts Dortmund (Handwerkskammer Dortmund).

About us

Frequently asked questions – Dortmund

What funding is available in 2026 for renovation in Dortmund?

In Dortmund there are three main routes: the state of NRW’s modernisation funding via the City of Dortmund and NRW.BANK (loans of up to €220,000 per flat with a repayment waiver), the federal funding for efficient buildings (BEG individual measures, e.g. a 15% grant for the building envelope), and KfW loans such as 159 or 261. Alternatively, there are tax reductions under § 35a and § 35c EStG.

Who is responsible for modernisation funding in Dortmund?

The City of Dortmund Housing Office (Amt für Wohnen), Housing Support team (Team Wohnraumförderung), Südwall 2-4, 44122 Dortmund, telephone 0231 50-23958, email wohnraumfoerderung@stadtdo.de. The city recommends an advice meeting before you apply.

Do I have to apply for funding before placing the order?

Yes, for almost all programmes. With Dortmund’s modernisation funding, work must not start before approval is granted, although supply and service contracts may be signed beforehand. With the BEG individual measures, the contract must contain a condition precedent or a condition subsequent linked to the funding approval; a simple right of withdrawal is not enough.

Can I combine funding and tax relief?

Not for the same measure. The tax reduction under § 35a EStG does not apply to publicly funded measures with a subsidised loan or a tax-free grant, and neither does § 35c EStG. You can, however, finance different measures in different ways – have the combination checked by a tax adviser.

Is there funding in Dortmund for a block of flats?

Yes. Modernisation funding for rented flats is aimed at owners of rental housing in Dortmund. Eligible work includes energy-efficiency modernisation, removing barriers, burglary protection and extensions or conversions, with up to €220,000 per residential unit. In return, rent and occupancy restrictions apply. Under the BEG, the maximum amounts are tiered by the number of residential units.

Is the KfW 455-B grant for an accessible bathroom still available in 2026?

No. According to KfW, applications have been suspended since 31 July 2026 because the funds for 2026 have been exhausted. The scheme may reopen if new federal funds become available in 2027. The 159 loan for age-appropriate conversion, with up to €50,000 per residential unit, remains available.

Projekt-Check

Your project in Dortmund? We’ll take a look.

Describe the property, scope and timeframe in the Projekt-Check. You will see your overview before entering contact details – Kuczak will then get back to you personally.

Start the Projekt-CheckOr call: +49 151 21598282

Overview before entering contact details. No commitment on price or dates.