Skip to content
Kuczak Generalunternehmen

Services · Strip-out

Strip-out and gutting to the agreed scope.

Before anything is stripped out, the scope, technical requirements and any hazardous substances must be clarified. Describe your project – we will agree the framework together.

Note: Work involving the load-bearing structure or hazardous substances requires specialist clarification and the appropriate qualifications. Scope and responsibilities will be confirmed with Kuczak before this page is published.

01

Suits your project if …

  • Interiors are to be stripped out before a modernisation
  • Fixtures or floor coverings are to be removed
  • A wall change is planned
Bathroom after strip-out with exposed walls, tools and buckets
InsightBathroom after strip-out, before the new fit-out

02

Scope

Check first, then strip out.

Technical requirements and possible hazardous substances must be clarified by specialists in advance. The Projekt-Check collects your details but does not provide instructions for strip-out or any assessment of building materials.

03

Before the quote

What we clarify in advance.

  1. 01Which building elements or rooms are affected
  2. 02Existing documents on the building
  3. 03Known indications of problematic building materials
  4. 04Planned wall changes
  5. 05Follow-on work after strip-out

A reliable quote requires a clearly defined scope of work. Depending on the project, further information or a site visit may be needed.

From an initial overview to coordinated delivery.

  1. 01

    Understand the project

    You describe the property and your goal. We collect open questions and clarify what information is still needed.

    You:
    Describe the property, goal and known conditions
    Kuczak:
    collect open questions, identify missing information
  2. 02

    Agree the scope

    We discuss the planned works, interfaces and general conditions. A site visit follows if needed.

    You:
    Contribute priorities and decisions
    Kuczak:
    Go through the works and interfaces together
  3. 03

    Coordinate delivery

    The works and coordination involved are organised on the basis of what has been agreed.

    You:
    Provide access and approvals as agreed
    Kuczak:
    organise the works and coordination involved
  4. 04

    Go through the result together

    At the end, we review the agreed scope and record any open points.

    You:
    Compare the result with the agreed scope
    Kuczak:
    record open points

Frequently asked questions

Do you assess online whether hazardous substances are present?

No. You can mention indications of problematic building materials; specialist clarification takes place before further planning.

Projekt-Check

Organise your project in a few steps.

The Projekt-Check brings your details together in an overview. Open points can stay open.

Describe your projectGet in touch directly

Overview before entering contact details. No commitment on price or dates.